Boca Raton seawall permits and the elevation rule
What the city asks for, who can pull the permit, and the elevation standard every new or replaced wall has to meet. Checked against the city's own pages on October 19, 2026.
What does Boca Raton require for a seawall permit?
The city's Dock/Seawall/Boatlift permit checklist lists:
- Contractor registration with the city, current at the time of application
- An initial deposit of 1% of the contract value, minimum $100 for the first $500 of the contract, with the balance due at issuance
- A contract, plans, a survey or site plan, and an architect or engineer seal
- Army Corps of Engineers approval
- Product approvals and/or a Notice of Acceptance (NOA)
- A certified Notice of Commencement on any building permit valued over $5,000, filed before the first inspection
- Sub-trade applications filed before permit issuance
The 4.0 to 6.0 foot NAVD88 elevation standard
The city's Engineering Design Standards Manual, Section 7.7, sets the minimum elevation for any new or replaced seawall or dock, public or private, at 4.0 feet NAVD88, with a maximum of 6.0 feet NAVD88. The design also has to allow 12 to 18 inches to be added later, in a defined future cap zone, without altering the existing wall. The seawall has to harmonize with adjacent grades and seawalls, and the wet face of the wall sits on the property line.
Bulkhead lines along the Intracoastal Waterway (the F.E.C. Canal), the easterly shore of Lake Wyman, and Lake Boca Raton are set by the city's own code. Single-family docks may protrude 6 to 8 feet waterward of the seawall, depending on canal width, and all structures must sit within lines projected 45 degrees waterward from the side property lines.
Who can pull a Boca Raton seawall permit?
Marine construction, including seawalls and bulkheads, falls under Florida's certified marine specialty contractor category, which also includes narrower marine seawall work, marine bulkhead work, marine dock work, and marine pile driving specialty licenses. Whoever pulls your permit must be registered with the City of Boca Raton and hold the right license category for the work.
Inspections
The city's process calls for a location survey before the cap is installed, then a final engineer report after construction documenting the cap elevation with photos. Combined dock and seawall projects add a marine structure survey before the framing inspection and a final marine structure survey.
Outside city limits
If your property sits in unincorporated Palm Beach County rather than inside Boca Raton, the county's Planning, Zoning and Building Division reviews marine structures under its own Type 8 checklist, which also calls for conformance with Army Corps of Engineers, Florida DEP, and Florida Inland Navigation District approvals where applicable. That is a different office from the city's Building Division described above.
Before you sign
Advertising as available to act as a contractor without being registered or certified is unlawful in Florida, and a licensed contractor's registration or certification number has to appear on their offers, bids, contracts, and advertisements. Look up any contractor on MyFloridaLicense.com before you sign.
Start a free request
Pick what you need. Five short questions.
Questions homeowners ask
What elevation does a new Boca Raton seawall have to meet?
A minimum of 4.0 feet NAVD88 and a maximum of 6.0 feet NAVD88, under the city's Engineering Design Standards Manual, Section 7.7. The design must also allow 12 to 18 inches to be added later without altering the wall.
What documents does a Boca Raton seawall permit need?
The city's checklist lists a contract, plans, a survey or site plan, an architect or engineer seal, Army Corps of Engineers approval, product approvals or NOA, and a Notice of Commencement on jobs over $5,000.
What is the initial deposit for a Boca Raton seawall permit?
1% of the contract value, with a minimum of $100 for the first $500 of the contract. The remaining balance is due when the permit is issued.
Does Palm Beach County or the City of Boca Raton issue my permit?
If your property is inside Boca Raton's city limits, the city's Building Division handles it. Just outside city limits, in unincorporated Palm Beach County, the county's Planning, Zoning and Building Division reviews marine structures under its own Type 8 checklist instead.
Sources
- Dock/Seawall/Boatlift Permit Submittal Checklist (City of Boca Raton Building Division)
- Section 7.7, Minimum Criteria for Waterway Features, Engineering Design Standards Manual (City of Boca Raton, updated January 2025)
- Seawalls and Marine Structures (City of Boca Raton Development Services)
- Type 8, Marine Structures, Application Sufficiency Checklist (Palm Beach County PZB Building Division)
- Fla. Admin. Code Ann. R. 61G4-15.100, certified marine specialty and marine seawall work contractor categories
- MyFloridaLicense.com license lookup (Florida DBPR)
- Florida Statute 489.127(1)(f), advertising as a contractor without a license (Florida Senate)
- Florida Statute 489.119(5)(b), contractor registration or certification number on offers, bids, contracts and advertisements (Florida Senate)
Get your wall looked at
Send a request and we will pass it to an independent licensed marine contractor who works Boca Raton canals and the Intracoastal. Have your address ready and, if you can, a few photos of the wall.
Free referral service. An independent licensed marine contractor does the work. How this works.
